Technical Specifications and Quantities: A technical specification is prepared in contact with you before the application. Material details to be used, application method, technical features, static calculations and principle details are included in this specification. Project material quantities and budgets are calculated over the existing architectural project and design.

Field Measurement – Survey: Field measurements required for the Application Project are carried out by a professional team with state-of-the-art precision measuring instruments. This measurement is modeled in computer environment and carries the building coordinate information for the application project.

Application project

1.Plan – Section – View Study

The survey, architectural project and visual design taken in the field are evaluated together and the application project that best suits the employer’s demands is prepared. The prepared project will be prepared with details suitable for the purpose of use of the building to meet the technical specification needs. All necessary detailed information will be defined on the drawings prepared for facade fabrication. This information;

  • Material descriptions, color and property information
  • Facade and joinery axles
  • Warning notes

2.Detail Drawings

The necessary cross-section and plan details are created for the preparation of production drawings. These details will contain all necessary insulation solutions and installation details.

3.Manufacturing Pictures

In line with the prepared application project and details, material manufacturing drawings are prepared by considering the minimum material waste criteria.

In this context;

  • Aluminum profile fabrication pictures
  • Anchor and fittings manufacturing pictures
  • Subframe manufacturing pictures
  • Sheet fabrication pictures
  • Glass dimensions and glass fabrication pictures
PURCHASING MANAGEMENT

1.Material Selection

Material alternatives are defined in accordance with the features defined in the technical specification. The selected materials will be evaluated in a way that they can be supplied in a quality in accordance with European standards, to meet the function expected from them in the best way, and to be supplied within a period that will not disrupt the work schedule. The determined materials are reported on cost, function and procurement process and submitted to the approval of the Employer.

2.Supplier Research

In line with the approval of the employer, a list of alternative suppliers is prepared by contacting the suppliers on behalf of the employer. The material is presented to the Employer with the delivery conditions. The employer participates in the negotiation process and determines the price, payment terms and procurement terms or the project manager makes the necessary contact on his behalf.

Technical Support and Controls:

  • Bill of Quantities and Materials
  • Real Quantity Calculations
  • Material Requirement Lists
  • Service Consulting
  • Service Supplier
  • Field Controls
  • Weekly Assembly Control
  • Progress report